---
title: "MVP development for non-technical founders, at a fixed price"
description: "MVP development for startups with a non-technical founder: a fixed price before the build starts and a first version in six to ten weeks. From £10,000."
url: https://www.88mph.tech/mvp-development/
last_modified: 2026-11-16
---
## Your MVP in six to ten weeks, at a price fixed before the build starts.

I build the first version of your product in short iterations, and you put each one in front of your customers. The price is fixed at the end of the discovery phase and does not move while I build.

[Book a free 30-min call](https://www.88mph.tech/call/)
[See all services and prices](https://www.88mph.tech/services/)

- From £10,000

- 6 to 10 weeks

- Something usable every one or two weeks

How the build runs

- A fixed price, agreed before the build starts

- A usable release every one or two weeks

- Your customers try each release

- The code and the accounts belong to your company

I am Federico Toscano, a fractional CTO based in London. I build MVPs for non-technical founders: the first version of a product, built in iterations of one or two weeks that the founder tests with real customers. MVP development costs from £10,000, with the exact price fixed at the end of a discovery phase, and takes six to ten weeks.

### What the MVP contains

The MVP is the first version of your product that real customers can use. It contains the core modules and the first group of modules chosen during the [discovery phase](https://www.88mph.tech/discovery-phase/). The other groups come later, in the order that helps you sell. Each one rests on the core that is already built, so it costs a fraction of the first.

### How the build works

I build in iterations of one or two weeks. Each iteration ends with something usable, which you can try yourself and put in front of your customers to get a real reaction. What they tell you goes into the next iteration, so the product is corrected every couple of weeks and you never wait until the end to find out whether it is right.

Throughout the build I explain each technical choice in plain language, with what it means for cost and for time, so that you are deciding with me and can account for every decision afterwards.

### Why the price is fixed after the discovery phase

I quote the price at the end of the discovery phase because a figure given earlier would have to include a margin for everything I do not know yet. Once the use cases, the data model and the modules are written down, I can commit to a number, and it stays fixed for the whole build.

The price is set on the result and on what the same result would cost you from another source, such as an agency. Days of work are a poor measure for this kind of project, because AI-assisted development lets several parts of the work run in parallel.

### How long it takes

MVP development takes six to ten weeks. The duration depends on how many kinds of user the product serves, how many outside services it connects to (payments, electronic signature, AI services), whether existing data has to be imported, and how quickly you and your first customers try each iteration and report back. That last factor usually has the largest effect: an iteration tested the same week keeps the build at six weeks, and feedback that arrives two weeks late adds those two weeks to the total.

### What it costs

MVP development costs from £10,000. The exact price depends on how many kinds of user the product serves, how many outside services it connects to and whether existing data has to be imported, and you have it in writing before the build starts.

The running costs of the product are separate and are paid directly to the suppliers. Hosting, the database, document storage, transactional email, monitoring and the domain together cost under £200 a month for a product with up to about a thousand users, and often under £20 a month at the start. Outside services such as AI, electronic signature or consent management vary with the supplier and the plan, and they are estimated in the discovery phase.

You can see this price next to every other service on the [services and prices](https://www.88mph.tech/services/) page.

### After the MVP

Once the MVP is with your first customers, the work turns to preparing a launch. The list of features missing for launch almost always changes when customers start using the product, so this part runs on a monthly [fractional CTO retainer](https://www.88mph.tech/fractional-cto/#cost) with goals set month by month, and it usually lasts two to three months.

Questions

### Questions founders ask about MVP development

How much does MVP development cost?

My MVP development costs from £10,000. The exact price is fixed at the end of the discovery phase, before the build starts. It depends on how many kinds of user the product serves, how many outside services it connects to, such as payments or electronic signature, and whether existing data has to be imported.

How long does it take to build an MVP?

I build an MVP in six to ten weeks, in iterations of one or two weeks. The largest effect on the calendar comes from how quickly you and your first customers try each iteration and report back. An iteration tested the same week keeps the build moving, and feedback that arrives two weeks late adds those two weeks to the total.

Can a non-technical founder get an MVP built without a CTO?

A non-technical founder can get an MVP built well when someone experienced makes the engineering decisions and explains them in plain language. Your part is deciding what the product has to prove and testing each release with customers. My part is the design of the product, the build, and telling you plainly what each choice means for cost and time.

Do I need the discovery phase before the MVP?

The fixed price of the MVP comes out of the discovery phase, because it depends on decisions made there: the use cases, the data model and which modules go into the first version. The discovery phase costs £4,500 and takes three to four weeks.

Who owns the code when the MVP is finished?

Your company owns the code, and the accounts for hosting, the domain and outside services are in your company's name. You can take the product to another developer at any point.

What does it cost to run the product once it is built?

Running costs are paid directly to the suppliers. For a product with up to about a thousand users, hosting, the database, document storage, email, monitoring and the domain together usually cost under £200 a month, and often under £20 a month at the start. Outside services such as AI or electronic signature vary with the supplier and are estimated in the discovery phase.

Start here

### Tell me what the first version has to prove

Book a free 30-minute call. Describe the product and who it is for, and I will tell you how the discovery phase and the build would work for you.

[Book a free 30-min call](https://www.88mph.tech/call/)
[Email me instead](mailto:federico@88mph.tech)

Looking for something else? [See all services and prices](https://www.88mph.tech/services/).
